Re: Maxima release?



>>>>> "Raymond" == Raymond Toy <toy@rtp.ericsson.se> writes:

    Raymond> James and I were discussing how the bugs list was getting longer
    Raymond> faster than it was getting shorter and he thought maybe we should have
    Raymond> a release soon.  Very briefly, the plan is to get a list of bugs that
    Raymond> "must" be fixed, squash them, create a release candidate, test for
    Raymond> some short time, and the release the final version.

A quick reminder.  This is what James wrote a while back on his
plans.  As far as I know, this still holds.  I don't know if we're at
the 5.9.0 or 5.9.2 part.  I'm pretty sure we're not at 6.0.0 yet.

Ray


Before 5.9.0
    -Comb through mailing list for missed fixes
    -Make Maxima pass all current tests with at least
        -Platforms
            -Linux
        -Lisp implementations
            -GCL
            -CMUCL
            -Clisp
    -Get xmaxima working

Before 5.9.1
    -The Great Source Downcasing

Before 5.9.2
    -Test/fix share packages

Before 6.0.0 (and after 5.9.0)
    -Finalize directory structure
    -Packaging
        -RedHat Linux
        -Debian Linux
        -Windows
    -More tests for test suite
    -Fix, or at least address, all bugs listed in Sourceforge system

During 6.1.X series
    -Work on numerical routines
        -GSL vs Fortran to Lisp, etc.
    -New GUI work
    -Improved Plotting